Airport rail link highly complex

A very sensible call in the Assembly yesterday to re-open the Antrim-Lisburn railway line was turned into something different by the media, namely a call for a rail link to the airport. That latter is much, much more complex and is a different case entirely (and the re-opening of the Antrim-Lisburn line, a good idea in itself, should absolutely not be predicated upon it).

The call for a railway link to the Airport is one of those things that people believe to be obvious but never take time to think about. The Twitter generation, sadly, is less inclined to think than it should be…

Let us start there: when are the biggest queues at the airport?

Very early in the morning.

The “red eye” flights to London and elsewhere are most packed (and most expensive) early in the morning – often between 6am and 7am – precisely because that’s when most people need to travel for a day’s (or even week’s) work.

To get to the airport for even an 0645 flight, you would want to be there at 0545, thus on a train leaving Central at 0515 at the very latest. Of course, you would want to get to Central by train – so there would need to be options from, say, Carrickfergus or Bangor from 0430. Remember, even this does not cover earlier flights! (There is no point running a service only from Central if people have to drive to it from the suburbs – they may as well just keep going and drive to the airport!)

Currently, the train system begins operation at 0600.

So there is an immediate problem. The whole system – drivers, station staff, security, porters etc as well as the actual trains – would need to come into operation a full hour and a half (actually really two hours) earlier. This would come at significant cost to the whole system (at least in Greater Belfast), all for one service! This is not seriously viable financially on current passenger numbers (given there is no guarantee huge numbers currently travelling to the airport by car or coach would transfer to the train anyway).

On top of this, services would have to be reliable and regular. This is a problem in itself because in fact there is no other reason to go to the airport other than for flights. Most airports which have rail connections (a small minority among comparable populations, contrary to popular opinion!) also have large conference centres, business premises, even entire industrial sites adjoined to them. It is hard to see the point in any service which is less than hourly (as it would simply be of no use to most people embarking on or meeting particular flights), yet any service which is as regular as that would still surely be fairly empty through most of the day (and thus would make a considerable loss).

It gets worse. An additional regular service like that would put impossible pressure on the Dargan Bridge, currently single track into Central from Yorkgate (unless, ludicrously, all services went via Lisburn, which would surely render them unlikely sources of transfers from the coach services available). The Bridge itself is due to be dualled as part of the York Street Interchange project, but the track would also need dualled, at considerable cost. The good news is that this is planned. The bad news is it is planned for the year 2040 (no joke). Again, all for one service (a service which comes at great cost to the overall system while itself being loss making).

The case for the Lisburn-Antrim service is clear cut (looking at transfers to bus routes etc.), but this is in its own right. The case for a link to an airport which has no other facilities and relatively few passengers (not least because it shares them with another nearby airport, but also because of the size of the area it realistically serves) is however much harder to justify. The public may want it, but try asking them to pay for it…

 

Advertisements

5 thoughts on “Airport rail link highly complex

  1. Right, ok, fair enough, international doesn’t make much sense for 24hr service, I’ll get back to that, but Ian, explain why city airport has a 25 minute uncovered badly signposted “rail link”? Massive missed opportunity there…

    As for aldergrove, the argument here seems to be “doesn’t work for early, busy, flights because of time. Imo that’s totally fine and valid but remember that to get to the airport the same time via bus, there’s only two buses that will get you to the airport before 6, so for first thing in the morning, no public transport services cut the mustard.

    If the assembly/airport operator were in any way brave, there’d be a free shuttle bus (for ticket holders) from Antrim station to the airport.

    Totally agree that there is no need to screw the Antrim/Lisburn line over this discussion, however saying “doesn’t do early flights” doesn’t really help the rest of us who fly regularly at other times. If there was to be a new line that went within reasonable (less than 10min walk) distance to airport, it’d be reckless not to consider adding a station that could serve the regular rail-day.

    Final side point: core argument is about people leaving but doesn’t deal with arrivals, if people could make it to Belfast for 9am without having to drive/be driven through traffic it’d make a massive difference to the assemblys two favourite things: tourism and inward investment.

    • I’d considered that last point, which leads us to three key points.

      1. Those shouldn’t be the Assembly’s priorities.

      2. That’s the case for the *City* Airport rail halt.

      3. Unless you close the City Airport, in which case an Aldergrove link may become viable after all…

      Now there’s a thought…

      • Can You explain more about “the City Airport rail halt”

      • The City Airport is directly opposite the Belfast-Bangor line, but the rail halt is a mile in either direction rather than directly opposite.

        It would appear obvious that one should simply be placed directly opposite.

        Yet, interestingly, ask the CEO of the City Airport about it, and he’ll say it would be nice but he really isn’t bothered.

  2. RobG says:

    Thing is such a decision would probably have to be taken out of the airports’ hands. They make money from the carparking and so will offer platitudes and little else. Aldergrove is the only one which has mention of a rail halt in its Development Masterplan. The issue is one of strategic regional infrastucture connectivity rather than what the airports themselves want!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: